Instructiuni tehnice Multifix SE 500 EJOT MULTIFIX® SE500
EJOT MULTIFIX®
SE500
Technical data sheet
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
EJOT MULTIFIX® SE500
Content
General
3
Anchorage in concrete
5
Product description
Properties and benefits
Application samples
Handling and storage
Applications and intended use
Mortar properties
Reactivity
3
3
3
4
4
4
4
Installation instructions
Installation accessories
Setting parameter
Recommended loads
5
8
9
11
Post-installed-rebar
13
Chemical resistance
37
Installation instruction
Cleaning and installation tools
Design anchorage and lap length
Fire resistance - Overlapping joints
Beam to wall connection (anchoring)
ETA
Application in (un-)
cracked concrete
ETA
Application in
cracked concrete
13
16
21
25
30
ETA
Post-installed rebar
4
Fire test report
Post-installed rebar
EJOT SE & Co. KG ∙ Market Unit Construction
∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
2
EJOT MULTIFIX® SE500
General
Product description
EJOT MULTIFIX® SE500 mortar is a 2-component reaction resin mortar based on a pure epoxy and will be
delivered in a exclusive 2-C cartridge system. This high performance product may be used in combination with
a hand-, battery-, or pneumatic tool and a static mixer. It was designed especially for the anchoring of threaded
rods and reinforcing bars into concrete.
Properties and benefits
> European Technical Assessment for bonded
fasteners acc. to EAD 330499-01-0601 (Option 1):
ETA-26/0189
> European Technical Assessment for post-installed
rebar acc. to EAD 330087-00-0601: ETA-26/0190
> For heavy anchoring - doweling and post-installed
rebar connection
> Overhead application
> Waterfilled bore holes
> Suitable for attachment points with small edgeand axial distances due t
o an anchoring free of
expansion forces
> High chemical resistance
> Low odour
> High bending and pressure strength
> Cartridge can be reused up to the end of the shelf
life by replacing the static mixer or resealing cartridge with the sealing cap
> State-of-the-art ingredients, complies with the
latest REACH regulations, free off Phenol, (CAS#
108-95-2), DETA/TETA (CAS#111-40-0),
Benzyl alcohols (CAS# 100-51-6),
Bisphenol-A (CAS# 80-05-7)
Certifications
Application samples
Suitable for the fixation of facades, roofs, wood
constructions, metal constructions; metal profiles,
columns, beams, consoles, railings, sanitary devices,
cable trays, piping, post-installed rebar connection
(reconstruction or reinforcement), etc.
Handling and storage
> Storage: store in a cold and dark place, storage temperature: from +5°C up to +35 °C
> Shelf life: 24 months for cartridges (ST)
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2
752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
3
EJOT MULTIFIX® SE500
Applications and intended use
> Base material: cracked and uncracked concrete, light-concrete, porous-concrete, solid masonry, hollow brick,
natural stone (Attention! natural stone, can discolour; shall be checked in advance.
> Anchor elements: Threaded rods (zinc plated or hot dip, stainless steel and high corrosion resistance steel),
reinforcing bars, internal threaded rods, profiled rod, steel section with undercuts (e.g. perforated section)
> Temperature range: Installation temperature +5°C up to +40°C;
Cartridge temperature min. +5°C; optimal +20°C;
Base material temperature after full curing -40°C to +72°C
Mortar properties
Properties
Test Method
Result
UV resistance
-
Pass
Watertightness
DIN EN 12390-8
0 mm
Temperature stability
-
≤ 80 °C
ph-value
-
> 12
Compressive strength
EN 196 Part 1
112 N / mm²
Flexural strength
EN 196 Part
1
46.0 N / mm²
Axial tensile strength
DIN EN ISO 527-2
24.3 N / mm²
E modulus
DIN EN ISO 527-2
5,275 N / mm²
Elongation at fracture
DIN EN ISO 527-2
1.1 %
Degree of shrinkage
DIN 52450
≤ 1.4 ‰
Hardness Shore A
DIN EN ISO 868
95.8
Hardness Shore D
DIN EN ISO 868
84.6
Density
-
≤ 1;50 kg / dm³
Reactivity
Temperature of base material
Gelling- and working time
Full curing time in dry base material1)
+5 °C to +9 °C
80 min.
60 h
+10 °C to +14 °C
60 min.
48 h
+15 °C to +19 °C
40 min.
24 h
+20 °C to +24 °C
30 min.
12 h
+25 °C to +34 °C
12 min.
10 h
+35 °C to +39 °C
8 min.
7h
+40 °C
8 min.
4h
Cartridge temperature
+5 °C to +40 °C
+5 °C to +40 °C
1) The curing times in wet concrete has to be doubled.
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
4
EJOT MULTIF
IX® SE500
Anchorage in concrete
Installation instruction
Drilling of the bore hole (HD. CD; HDB)
1a.
Hammer drilling (HD) or compressed air drilling (CD).
Drill a hole into the base material to the size and embedment depth required by the selected anchor (see page 9)
Proceed with Step 2. In case of aborted drill hole, the drill hole shall be filled with mortar.
2a.
Hollow drill bit system (HDB)
Drill a hole into the base material to the size and embedment depth required by the selected anchor (see page 9).
This drilling system removes the dust and cleans the bore hole during drilling (all conditions).
Proceed with Step 3. In case of aborted drill hole, the drill hole shall be filled with mortar.
Attention! Standing water must be removed before cleaning.
MAC: Cleaning for dry and wet bore hole with diameter d0 ≤ 20mm and bore hole depth h0 ≤ 10dnom (uncracked concrete only!)
2a.
Starting from the bottom or back of the bore hole, blow the hole clean with handpump (see page 8) a
minimum of
four times until return air stream is free of noticeable dust.
2b.
Check brush diameter (see page 9). Brush the hole with an appropriate sized wire brush > db,min (see page 9)
a minimum of four times in a twisting motion. If the bore hole ground is not reached with the brush, a brush
extension must be used.
2c.
Finally blow the hole clean again with handpump (see page 8) a minimum of four times until return air stream is
free of noticeable dust.
After cleaning. the bore hole has to be protected against re-contamination in an appropriate way. until dispensing the mortar in the bore hole. If necessary. the cleaning has to be
repeated directly before dispensing the mortar. In-flowing water must not contaminate the bore hole again.
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
5
EJOT MULTIFIX® SE500
CAC: Cleaning
for dry, wet and water-fi lled bore holes with all diameter in unrcracked and cracked concrete
2a.
Starting from the bottom or back of the bore hole, blow the hole clean with compressed air (min. 6 bar)
(see page 8) a minimum of two times until return air stream is free of noticeable dust. If the bore hole ground is
not reached an extension must be used.
2b.
Check brush diameter (see page 8). Brush the hole with an appropriate sized wire brush > db,min (see page 9)
a minimum of two times in a twisting motion. If the bore hole ground is not reached with the brush, a brush
extension must be used.
2c.
Finally blow the hole clean again with compressed air (min. 6 bar) (see page 8) a minimum of two times until
return air stream is free of noticeable dust. If the bore hole ground is not reached an extension must be used.
3.
Attach a supplied static-mixing nozzle to the cartridge and load the cartridge into the correct dispensing tool.
After every working interruption longer than the rec
ommended working time (see page 4) as well as for new
cartridges, a new static-mixer shall be used.
4.
Prior to inserting the anchor rod into the filled bore hole, the position of the embedment depth shall be marked
on the anchor rods.
5.
Prior to dispensing into the anchor hole, squeeze out separately a minimum of three full strokes and discard
non-uniformly mixed adhesive components until the mortar shows a consistent grey or red colour.
6.
Starting from the bottom resp. back of the cleaned anchor hole fill the hole up to approximately two-thirds with
adhesive. Slowly withdraw of the static mixing nozzle as the hole is filled avoids creating air pockets. If the bore
hole ground is not reached with the static-mixing nozzle, a appropriate extension must be used. Observe the gel-/
working times given (see page 4).
7.
Piston plugs shall be used acc. to table on page 9 for the following application:
> Horizontal assembly (horizontal direction) and ground erection (vertical downwards):
Drill bit-Ø d0 ≥ 18 mm
and embedment depth hef > 250mm
> Overhead assembly (vertical upwards direction): Drill bit-Ø d0 ≥ 18 mm.
Assemble mixing nozzle, mixer extension and piston plug before injecting mortar.
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
6
EJOT MULTIFIX® SE500
8.
Insert piston plug to back of the hole and inject adhesive. If the bottom or back of the anchor hole is not reached,
an appropriate extension nozzle must be used.
During injection the piston plug is naturally pushed out of the borehole by the back pressure of the mortar.
Observe the gel-/working times given in the table on page 4.
9.
Push the fixing element into the anchor hole while turning slightly to ensure positive distribution of the adhesive
until the embedment mark has reached the surface level.
The anchor should be free of dirt, gr
ease, oil or other foreign material.
10.
After inserting the anchor, the annular gap between anchor rod and concrete, in case of a push through installation additionally also the fixture, must be complete filled with mortar. If excess mortar is not visible at the top of
the hole, the requirement is not fulfilled and the application has to be renewed.
11.
For overhead application the anchor rod shall be fixed (e.g. wedges) until the mortar has started to harden.
12.
Allow the adhesive to cure to the specified time prior to applying any load or torque. Do not move or load
the anchor until it is fully cured (see page 4).
13.
After full curing, the add-on part can be installed with up to the max. torque (see page 9) by using a calibrated
torque wrench. It can be optional fi lled the annular gap between anchor and fixture with mortar. Therefor substitute the washer by the fi lling washer and connect the mixer reduction nozzle to the tip of the mixer. The annular
gap is fi lled with mort
ar, when mortar oozes out of the washer.
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
7
EJOT MULTIFIX® SE500
Installation accessories
MAC - Hand pump (volume 750 ml)
Drill bit diameter (d0): up to 20 mm
Drill hole depth (h0): < 10 dnom
Uncracked concrete only
CAC - Rec. compressed air tool (min 6 bar)
Drill bit diameter (d0): all diameters
Brush RBT and brush extension
HDB – Hollow drill bit system
Drill bit diameter (d0): all diameters
The hollow drill bit system contains the Heller Duster Expert
hollow drill bit and a class M vacuum with minimum
negative pressure of 253 hPa and flow rate of
minimum 150 m³/h (42 l/s).
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construc
tion
8
EJOT MULTIFIX® SE500
Threaded
rod
Rebar
d0
Drill bit - ø
HD
db
Brush - ø
db. min
min.
Brush - ø
[mm]
[mm]
[mm]
[-]
[mm]
[mm]
M8
8
10
RBT 10
11.5
10.5
M10
8 / 10
12
RBT 12
13.5
12.5
M12
10 / 12
14
RBT 14
15.5
14.5
-
12
16
RBT 16
17.5
16.5
Piston plug
Installation
direction and use of piston plug
[-]
hef>
250 mm
all
No piston plug required
M16
14
18
RBT 18
20.0
18.5
VS 18
-
16
20
RBT 20
22.0
20.5
VS 20
M20
-
22
RBT 22
24.0
22.5
VS 22
-
20
25
RBT 25
27.0
25.5
VS 25
M24
-
28
RBT 28
30.0
28.5
VS 28
M27
24 / 25
30
RBT 30
31.8
30.5
VS 30
-
24 / 25
32
RBT 32
34.0
32.5
VS 32
M30
28
35
RBT 35
37.0
35.5
VS 35
-
32
40
RBT 40
43.5
40.5
VS 40
M33
-
38
RBT 38
40.0
38.8
VS 38
M36
-
42
RBT 42
44.0
42.8
VS 42
-
36
45
RBT 45
47.0
45.8
VS 45
M39
-
45
RBT 45
47.0
45.8
VS 45
-
40
50
RBT 50
52.0
50.8
VS 50
M42
-
52
RBT 52
54.0
52.8
VS 5
2
M48
-
60
RBT 60
62.0
60.8
VS 60
hef>
250 mm
Setting parameters
Anchor size
M10
M12
M16
M20
M24
M27
M30
M33
M36
M39
M42
M48
Outdoor diameter of anchor
d = dnom
[mm] 8
M8
10
12
16
20
24
27
30
33
36
39
42
48
Nominal drill hole diameter
d0
[mm] 10
12
14
18
22
28
30
35
38
42
45
52
60
hef.min
[mm] 60
60
70
80
90
96
108
120
132
144
156
168
192
hef.max
[mm] 160
200
240
320
400
480
540
600
660
720
780
840
960
Pre-positioned
[mm] 9
anchorage df ≤
12
14
18
22
26
30
33
36
39
42
45
52
In-place
anchorage df
[mm] 12
14
16
20
24
30
33
40
40
44
47
54
62
20
35
60
100
170
250
300
330
360
390
460
550
Effective embedment depth
Diameter of clearance hole
in the fixture
Maximum torque moment
Tinst≤
[mm] 10
Minimum thickness of member
hmin
[mm]
Minimum spacing
Smin
[mm] 40
50
60
75
95
115
125
140
165
180
195
210
240
Minimum edge distance
Cmin
[mm] 35
40
45
5
0
60
65
75
80
165
180
195
210
240
hef + 30 mm ≥ 100 mm
hef +2d0
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
9
EJOT MULTIFIX® SE500
Rebar size
ø8 1)
ø10 1)
ø12 1)
ø14
ø16
ø20
ø24
ø25
ø28
ø32
ø36
ø40
10
12
Outdoor diameter of anchor
d = dnom
[mm]
8
14
16
20
25
25
28
32
36
40
Nominal drill hole diameter
d0
[mm]
10 12 12 14 14 16 18
20
25
32
32
35
40
45
50
hef.min
[mm]
60
60
70
75
80
90
96
100
112
128
144
240
hef.max
[mm]
160
200
240
280
320
400
480
500
560
640
720
800
Minimum thickness of member
hmin
[mm]
hef + 30 mm
≥ 100 mm
Minimum spacing
Smin
[mm]
40
50
60
70
75
95
120
120
130
150
180
200
Minim edge distance
Cmin
[mm]
35
40
45
50
50
60
70
70
75
85
180
200
Effective embedment depth
1)
hef + 2d
0
Both nominal drill hole diameters d0 can be used.
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
10
EJOT MULTIFIX® SE500
Recommended loads
Threaded rod
The recommended loads are only valid for single anchors for a basic design, if the following conditions
are valid:
c ≥ 1.5 x hef | s ≥ 3.0 x hef | h ≥ 2 x hef
Ψsus = 1.0; percentage of dead load ≤ Ψ0sus see table below
The recommended loads have been calculated using the partial safety factors for resistances stated in the
ETA and with a partial safety factor for actions of γf = 1.4.
The partial safety factor for seismic action is γ1 = 1.0.
If the conditions are not fulfilled the loads must be calculated acc. to EN 1992-4.
For further details observe ETA-26/0189.
Recommended tension load
Recommended loads for a working life of 50 years
> Property class 8.8
>
Concrete - C20/25
> Hammer- (HD) and compressed air drilling (CD)
> dry, wet concrete and flooded bore hole
40 °C / 24 °C ¹) uncracked
Ψ0sus = 0.60
cracked
60 °C / 35 °C 1)
Ψ0sus = 0.60
70 °C / 43 °C 1)
Ψ0sus = 0.60
Recommended
shear load without
lever arm 2)
M8
M10
M12
M16
M20
M24
M27
M30
M33 3)
M36 3)
M39 3)
M42 3)
M48 3)
Nrec.stat
[kN]
14.4
20
27
32.7
51.9
71.3
92.6
103.9
95.8
109.6
123.9
144
176
Nrec.stat
[kN]
4.8
6.7
9.9
15
25.4
32.3
43.3
51.9
67
76.7
79.2
94.2
123.1
uncracked
Nrec.stat
[kN]
6.8
9.6
14.1
20.3
34.5
48.5
64.9
74.2
cracked
Nrec.stat
[kN]
3.4
4.8
7.1
10.7
18.2
24.2
32.5
38.9
uncracked
Nrec.stat
[kN]
4.8
6.7
9.9
13.9
23.6
32.3
43.3
51.9
cracked
Nrec.stat
[kN]
2.4
3.4
4.9
7.5
12.7
16.2
21.6
26
uncracked
Vrec.stat
[kN]
9.7
11.9
16.5
20.8
34.1
48.1
63.5
72.3
93.3
106.1
120.3
140.4
174.6
cracked
Vrec.stat
[kN]
6.7
8.4
11.7
14.8
24.2
34
45
51.2
66.1
75.2
85.2
99.5
123.7
NPA
Embedment depth
hef
[mm] 80
90
110
125
170
210
250
270
320
350
380
420
480
Edge distance
c≥
[mm] 120
135
165
188
255
315
375
405
480
525
570
630
720
Axial distance
s≥
[mm] 240
270
330
375
510
630
750
810
960
1050
1140
1260
1440
Short term temperature / long term temperature.
Shear loads are valid for all specified temperature ranges.
3)
Application is not covered by the ETA-26/0189
Nrec.stat. Vrec.stat = Recommended load under static and quasi-static action
NPA = no performance assessed
1)
2)
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
11
EJOT MULTIFIX® SE500
Recommended loads
Rebar
The recommended loads are only valid for single anchors for a basic design, if the following conditions
are valid:
c ≥ 1.5 x hef | s ≥ 3.0 x hef | h ≥ 2 x he
f
Ψsus = 1.0; percentage of dead load ≤ Ψ0sus see table below
The recommended loads have been calculated using the partial safety factors for resistances stated in the
ETA and with a partial safety factor for actions of γf=1.4.
The partial safety factor for seismic action is γ1 = 1.0.
If the conditions are not fulfilled the loads must be calculated acc. to EN 1992-4.
For further details observe ETA-26/0190.
Recommended loads for a working life of 50 years
> Property class BSt 500
> Concrete - C20/25
> Hammer- (HD) and compressed air drilling (CD)
> dry, wet concrete and flooded bore hole
Ø8
Ø10
Ø12
Ø14
Ø16
Ø18
Ø20
Ø24
Ø25
Ø32
Ø36 3)
Ø40 3)
uncracked
Nrec.stat
[kN]
9.6
13.5
19.3
20.6
23.4
37.1
49.1
50.9
66.1
74.2
109.6
123.9
cracked
Nrec.stat
[kN]
4.1
6.7
9.9
11.2
13.9
21.8
31.5
33.7
41.1
50.8
74.1
86.8
60 °C / 35 °C 1)
Ψ0sus = 0.60
uncracked
Nrec.stat
[kN]
6.5
9.1
13.4
14.6
18.2
30.9
39.4
42.1
56.1
69.2
crack
ed
Nrec.stat
[kN]
2.7
4.3
6.3
7.7
8.5
14.5
21
22.4
26.2
32.3
70 °C / 43 °C 1)
Ψ0sus = 0.60
uncracked
Nrec.stat
[kN]
4.1
5.8
8.5
10.3
12.8
20
28.9
30.9
37.4
46.2
cracked
Nrec.stat
[kN]
1.7
2.4
3.5
4.3
5.3
9.1
13.1
14
18.7
23.1
Recommended shear
load without lever
arm 2)
uncracked
Vrec.stat
[kN]
6.7
10.5
14.8
18
20.8
34.1
46.4
48.4
63.8
73
106.1
121.3
cracked
Vrec.stat
[kN]
4.8
6.7
9.9
12
14.8
24.2
32.8
34.3
45.2
51.7
75.2
86
Embedment depth
hef
[mm]
80
90
110
115
125
170
205
210
250
270
350
380
Edge distance
c≥
[mm]
120
135
165
172.5
187.5
255
307.5
315
375
405
525
570
Axial distance
s≥
[mm]
240
270
330
345
375
510
615
630
750
810
1050
1140
Recommended tension load
40 °C / 24 °C ¹)
Ψ0sus = 0.60
NPA
Short term temperature / long term temperature.
Shear loads are valid for all specified temperature ranges.
3)
Application is not covered by the ETA-26/0190.
Nrec.
stat. Vrec.stat = Recommended load under static and quasi-static action
NPA = no performance assessed
1)
2)
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
12
EJOT MULTIFIX® SE500
Post-installed rebar
Installation instruction
A) Bore hole drilling
Note: Before drilling. remove carbonated concrete and clean contact areas. in case of aborted drill hole: the drill hole shall be filled with mortar.
1a.
Hammer (HD) or compressed air drilling (CD).
Drill a hole into the base material to the size and embedment depth required by the selected reinforcing bar.
Proceed with Step B1.
1b.
Hollow drill bit system (HDB)
Drill a hole into the base material to the size and embedment depth required by the selected reinforcing bar.
This drill system removes the dust and cleans the bore hole during drilling.
Proceed with Step C.
1c.
Diamond d
rilling (DD).
Drill with diamond drill a hole into the base material to the size and embedment depth required by the selected
anchor.
Proceed with Step B2.
Attention! Standing water must be removed before cleaning.
B1) Bore hole cleaning
MAC: Cleaning for dry and wet bore hole with diameter d0 ≤ 20mm and bore hole depth h0 ≤ 10dnom with drilling method HD/CD
2a.
Starting from the bottom or back of the bore hole, blow the hole clean with handpump (see page 15) a minimum
of four times until return air stream is free of noticeable dust.
2b.
Check brush diameter (see page 16 - 17). Brush the hole with an appropriate sized wire brush > db,min
(see page 15) a minimum of four times in a twisting motion. If the bore hole ground is not reached with the
brush, a brush extension must be used.
2c.
Finally blow the hole clean again with handpump (see page 15) a minimum of four times until return air stream is
free of noticeable dust.
After cleaning, the bore hole has to be protected agains
t re-contamination in an appropriate way, until dispending the mortar in the bore hole. If necessary, the cleaning has to be
repeated directly before dispensing the mortar. In-flowing water must not contaminate the bore hole again.
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
13
EJOT MULTIFIX® SE500
CAC: Cleaning for all bore hole diameter and bore hole depth with drilling method DD
2a.
Starting from the bottom or back of the bore hole, blow the hole clean with compressed air (min. 6 bar)
(see page 15) a minimum of two times until return air stream is free of noticable dust. If the bore hole ground is
not reached an extension shall be used.
2b.
Check the brush diameter (see page 16 - 17). Brush the hole with an appropriate sized wire brush > db,min (see
page 16 - 17) a minimum of two times. If the borehole ground is not
reached with the brush, a brush extension
shall be used.
2c.
Finally blow the hole clean again with compressed air (min. 6 bar) (see page 15) a minimum of two times until
return air stream is free of noticable dust. If the bore hole ground is not reached an extension shall be used.
After cleaning, the bore hole has to be protected against re-contamination in an appropriate way, until dispending the mortar in the bore hole. If necessary, the cleaning has to be
repeated directly before dispensing the mortar. In-flowing water must not contaminate the bore hole again.
B2) Bore hole cleaning
SPCAC: Cleaning for all bore hole diameter and bore hole depth with drilling method DDwith drilling method DD
2a.
Rinsing with water until clear water comes out.
2b.
Check the brush diameter (see page 16 - 17). Brush the hole with an appropriate sized wire brush > db,min
(see page 16 - 17) a minimum of two times. If the borehole ground is not reached with the brush, a brush
extension shall be used.
2c.
Rinsing again with water until clear water comes out.
Attention! Standing water in the bore hole must be removed before cleaning.
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
14
EJOT MULTIFIX® SE500
2d.
Starting from the bottom or back of the bore hole, blow the hole clean with compressed air (min. 6 bar)
(see page 16) a minimum of two times until return air stream is free of noticable dust. If the bore hole ground is
not reached an extension shall be used
2e.
Check the brush diameter (see page 18 - 19). Brush the hole with an appropriate sized wire brush > db,min
(see page 18 - 19) a minimum of two times. If the borehole ground is not reached with the brush, a brush
extension shall be used.
2f.
Finally blow the hole clean again with compressed air (min. 6 bar) (see page 16) a minimum of two times until
return air
stream is free of noticable dust. If the bore hole ground is not reached an extension shall be used.
After cleaning, the bore hole has to be protected against re-contamination in an appropriate way, until dispending the mortar in the bore hole. If necessary, the cleaning has to be
repeated directly before dispensing the mortar. In-flowing water must not contaminate the bore hole again.
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
15
EJOT MULTIFIX® SE500
Cleaning and installation tools
Rec. compressed air tool hand slide valve (min 6 bar)
Brush RBT and brush extension
Hand pump (volume 750 ml)
SDS Plus Adapter
HDB - Hollow drill bit
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.c
om/construction
16
EJOT MULTIFIX® SE500
C) Perparation of bar and cartridge
3a.
Attach the static mixer tightly onto the cartridge and insert the cartridge into a suitable dispensing tool. For every
working interruption longer than the recommended working time (see page 4) as well as for new cartridges, a
new static-mixer shall be used.
3b.
In case of using the mixer extension VL16/1,8 the tip on the mixer nozzle has to be cut off at position „X“.
4.
Prior to inserting the reinforcing bar into the fi lled bore hole, the position of the embedment depth shall be marked (e.g. with tape) on the reinforcing bar and insert bar in empty hole to verify hole and depth lv (see page 18).
The bar should be free of dirt, grease, oil or other foreign material.
5.
Prior to dispensing into the anchor hole, squeeze out separately the mortar until it shows a consistent grey or
red colour, but a minimum of three full strokes and discard non-uniformly mixed adhesive components.
D) Filling th
e bore hole
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
17
EJOT MULTIFIX® SE500
level mark
lm
lv. le.ges
Injection tool must be marked by mortar level mark lm and anchorage depth lv resp. le.ges with tape or marker.
Quick estimation: lm = 1/3 * lv
Continue injection until mortar level mark lm becomes visible.
Optimum mortar volume: lm = lv rep. le.ges * (1.2 * ز/d0² * 0.2) [mm]
Brushes, piston plugs, maximum embedment depth and mixer extension,
hammer (HD), diamond (DD) and compressed air drilling (CD)
Bar
size
Ø
[mm]
8
10
12
Drill bit-Ø
db.min
db
Brush-Ø
min.
Brush-Ø
Piston
plug
Pneumatic tool
Hand or battery tool
Mixer
extension
lv.max
Mixer
extension
lv.max
Mixer
extension
[Nr.]
[cm]
[-]
[cm]
[-]
[cm]
[-]
-
250
250
250
12.5
-
700
800
800
12.5
-
250
250
250
15.5
14.5
VS1
4
700
1000
1000
15.5
14.5
VS14
250
250
250
DD
CD
[mm]
[mm]
[mm]
[-]
[mm]
[mm]
10
10
-
RB10
11.5
10.5
12
12
-
RB12
13.5
12
12
-
RB12
13.5
14
14
-
RB14
14
14
-
RB14
16
16
16
RB16
17.5
16.5
VS16
18
18
18
RB18
20.0
18.5
VS18
16
20
20
20
RB20
22.0
20.5
VS20
25
25
-
RB25
27.0
25.5
VS25
-
-
26
RB26
28.0
26.5
VS25
22
28
28
28
RB28
30.0
28.5
VS28
24/25
32
32
32
RB32
34.0
32.5
VS32
28
35
35
35
RB35
37.0
35.5
VS35
32/34
40
40
40
RB40
43.5
40.5
VS40
36
45
45
45
RB45
47.0
45.5
VS45
-
52
-
RB52
54.0
52.5
VS52
55
-
55
RB55
58.0
55.5
VS55
40
Hand or battery tool
lv.max
HD
14
20
Cartridge: side-by-side
(1400 ml)
Cartridge: 440 ml or 585 ml
VL 10/0.75
or
VL 16/1.8
1200
700
VL 10/0.75
or
VL 16/1.8
1400
1300
VL 10/0.75
or
VL 16/1.8
1600
500
VL 16/1.8
1000
-
2000
-
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe âˆ
™ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
18
EJOT MULTIFIX® SE500
Brushes, piston plugs, maximum embedment depth and mixer extension,
hollow drill bit system (HDB)
Bar
size
Ø
Drill bit-Ø
db.min
db
Brush-Ø
min.
Brush-Ø
HDB
[mm]
8
10
12
[mm]
[-]
[mm]
[mm]
Piston
plug
[Nr.]
Cartridge: 440 ml or 585 ml
Cartridge: side-by-side
(1400 ml)
Hand or battery tool
Hand or battery tool
Pneumatic tool
lv.max
Mixer
extension
lv.max
Mixer
extension
lv.max
Mixer
extension
[cm]
[-]
[cm]
[-]
[cm]
[-]
10
-
250
250
250
12
-
700
800
800
14
-
14
VS14
14
16
14
18
16
20
250
250
250
700
1000
1000
250
250
250
VS16
No cleaning required
VS18
700
VS20
20
25
VS25
22
28
VS28
24/25
32
VS32
28
35
VS35
32/34
40
VS40
VL 10/0.75
or
VL 16/1.8
VL 10/0.75
or
VL 16/1.8
1000
VL 10/0.75
or
VL 16/1.8
1000
500
6a.
Starting from the bottom or back of the cleaned bore hole
fill the hole with adhesive, until the level mark at the
mixer extension (see below) is visible at the top of the hole. If the bottom or back of the hole is not reached, an
appropriate extension nozzle must be used.
Slowly withdraw the static mixing nozzle and using a piston plugs during injection of the mortar, helps to avoid
creating air pockets. Observe the gel-/working times given on page 4.
6b.
Piston plugs shall be used according to table on page 18 - 19 for the following application:
For overhead and horizontal installation.
In vertical downwards direction with bore holes deeper than 240 mm.
Assemble mixing nozzle, mixer extension and piston plug before injecting mortar.
6c.
Insert piston plug to back of the hole and inject adhesive. If the bottom or back of the anchor hole is not reached,
an appropriate extension nozzle must be used. During injection the piston plug will be naturally extruded out of
the drill hole by the adhesive pressure. Observe gel-/ working times given o
n page 4.
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
19
EJOT MULTIFIX® SE500
E) Inserting the rebar
7.
Push the reinforcing bar into the anchor hole while turning slightly to ensure positive distribution of the adhesive
until the embedment depth is reached.
The bar should be free of dirt, grease, oil or other foreign material.
8a.
Be sure that the bar is inserted in the bore hole until the embedment mark is at the concrete surface and that
excess mortar is visible at the top of the hole. If these requirements are not maintained, the application has to be
renewed. For overhead application the anchor rod shall be fi xed (e.g. wedges).
8b.
For horizontal and overhead installation fix embedded part (e. g. with wedges) until the mortar
has started to harden.
9.
Observe gelling time tgel. Attend that the gelling time can v
ary according to the base material temperature
(see page 4). It is not allowed to move the bar after geling time tgel has elapsed. Allow the adhesive to cure to the
specified time prior to applying any load. Do not move or load the bar until it is fully cured (attend table on
page 4). After full curing time tcure has elapsed, the add-on part can be installed.
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
20
EJOT MULTIFIX® SE500
Design anchorage and lap length
The calculation of the design anchoring lengths of reinforcing bars, if used as end anchoring or as
overlapping joint, has to consider the details and provisions of the approval ETA-26/0190 and the
EN 1992-1-1:2004+AC:2010.
The design load with corresponding failure mode („pull-out failure“ or „steel failure“) were determined for selected rebar diameters and a
nchorage lengths. The results for end anchoring and overlapping joints are given in
the tables below.
The calculations are based on following assumptions:
> Rebar BSt 500 S. fyk = 500 N/mm². Material safety factor of γs = 1.15
> Concrete class C20/25 and „good bond conditions“ acc. EN 1992-1-1:2004+AC:2010 considered.
Rebar diameters ≤ d = 32 mm.
> The bond properties of the bars is considered by the coefficients:
= 1.0; is for the effect of the form of the bars assuming adequate cover;
a1
1.0 for straight rebars
= 1.0; is for the effect of concrete minimum cover; has to be checked
a2
= 1.0; is for the effect of confinement by transverse reinforcement;
a3
1.0 for no transverse reinforcement
= 1.0; is for the influence of one or more welded transverse bars;
a4
1.0 for no welded transverse reinforcement
= 1.0; is for the effect of the pressure transverse;
a5
1.0 if no transverse pressure is assumed
= 1.5; is for the percentage of lapped bars relative to the total
cross section area.
a6
1.5 due to the given situation on the construction side
All drilling methods hammer drilling (HD), compressed air drilling (CD), Hollow drill bit (HDB), Diamond drilling
(DD) are considered by the amplification factor of alb = 1.0
End anchoring of slabs or beams (e.g. designed as
simply supported)
Overlapping joint for rebar connections of slabs and
beams
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
21
EJOT MULTIFIX® SE500
Rebar Ø8 - Ø32
>
>
>
>
Concrete class C20/25
Rebar BSt 500 S;
fyk = 500 N/mm²
Hammer- (HD), hollow- (HDB) or compressed air
(CD) or diamond drilling (DD)
End anchoring
Overlapping joint
a1 = a2 = a3 = a4 = a5 = 1.0
a1 = a2 = a3 = a4 = a5 = 1.0
a6 = 1.5
alb = 1.0
alb = 1.0
d
NRd.s
lv.max
lbd
NRd
Volume mortar
l0
NRd
Volume Mortar 1)
[mm]
[kN]
[mm]
[mm]
[
kN]
[ml]
[mm]
[kN]
[ml]
113
6.6
9
200
7.7
15
200
11.6
15
320
12.3
24
290
16.8
22
440
17
33
378
21.9
29
567
21.9
43
142
10.2
13
213
10.2
19
250
18.1
23
380
18.3
34
360
26
33
550
26.5
50
473
34.1
43
709
34.1
64
170
14.8
18
255
14.8
27
300
26
32
450
26
48
430
37.3
45
650
37.6
69
567
49.2
60
851
49.2
90
198
20.1
24
298
20.1
36
350
35.4
42
530
35.7
64
500
50.6
60
760
51.3
92
662
66.9
80
992
66.9
120
227
26.2
31
340
26.2
46
400
46.2
54
600
46.2
81
580
67.1
79
860
66.3
117
756
87.4
103
1134
87.4
154
284
41
60
425
41
90
500
72.3
106
760
73.2
161
720
104
153
1090
105
231
945
136.6
200
1418
136.6
301
312
49.6
22
468
49.6
132
550
87.4
39
830
88
235
790
125.6
56
1190
126.1
336
1040
165.3
73
1560
165.3
441
340
59
144
510
59
216
600
104
253
910
105.2
384
860
149.1
363
1310
151.4
553
1134
196.7
479
1701
196.7
718
354
64
133
532
64
200
630
113.8
237
950
114.4
357
910
164.4
342
1360
163.8
511
1181
213.4
444
1772
213.4
666
397
80.3
165
595
80.3
247
710
143.6
295
1060
143
441
1020
206.4
424
1520
205
632
1323
267.7
550
1985
267.7
825
Ø8
Ø10
Ø12
Ø14
Ø16
Ø20
Ø22
Ø24
Ø25
Ø28
1)
2)
21.9
34.1
49.2
66.9
87.4
136.6
165.3
196.7
213.4
267.7
1000
(1000)
1000
(1000)
1200
(1000)
1400
(1000)
1600
(1000)
2000
(1000)
2000
(1000)
2000
(1000)
2000
(1000)
2000
(1000
Mortar volume of the overlap joint. The mortar volume of the concrete cover c1, at the face of the existing reinforcing steel, was not taken into account.
lv,max is limited to 1000 mm, see ETA-26/0190
EJOT SE & Co. KG ∙ Market Unit Construction ∙ In der Stockwiese 35 ∙ 57334 Bad Laasphe ∙ Germany
T +49 2752 9080 ∙ F +49 2752 908731 ∙ construction@ejot.com ∙ www.ejot.com/construction
22
EJOT MULTIFIX® SE500
Rebar Ø8 - Ø32
>
>
>
>
Con
crete class C20/25
Rebar BSt 500 S;
fyk = 500 N/mm²
Hammer- (HD), hollow- (HDB) or compressed air
(CD) or diamond drilling (DD)
End anchoring
Overlapping joint
a1 = a2 = a3 = a4 = a5 = 1.0
a1 = a2 = a3 = a4 = a5 = 1.0
a6 = 1.5
alb = 1.0
alb = 1.0
d
NRd.s
lv.max
lbd
NRd
Volume mortar
l0
NRd
Volume Mortar 1)
[mm]
[kN]
[mm]
[mm]
[kN]
[ml]
[mm]
[kN]
[ml]
454
104.9
246
681
104.9
369
810
187.3
440
1120
172.6
608
1160
268.2
630
1560
240.5
847
1512
349.7
821
2000 2)
308.3
1086
Ø32
1)
2)
2000
(1000)
349.7
Mortar volume of the overlap joint. The mortar volume of the concrete cover c1, at the face of the existing reinforcing steel, was not taken into account.
lv,max is limited to 1000 mm, see ETA-26/0190
The specified design load NRd (End anchoring, Overlapping joints) can be converted to further concrete classes,
while maintaining the previously accepted boundary conditions and anchorage lengths lbd or lap length l0. with
the approach as fo
llows:
NRd,con = min (NRd,s; NRd * fbd,con- Factor * kb- Factor) [kN]
The conversion factor fbd,con , with the corresponding reduction factor kb, can be taken from the following table
depending on the drilling method, the concrete class and the diameter of the rebar:
Hammer drilling (HD), compressed air drilling (CD), hollow drill bit system (HDB)
Rebar
Ø
Ø8 to Ø32 mm
Concrete
class
fbd
fbd.con
- Factor
kb
- Factor
fbd
fbd.con
- Factor
kb
- Factor
fbd
fbd.con
- Factor
kb
- Factor
fbd
fbd.con
- Factor
kb
- Factor
[-]
[N/mm²]
[-]
[-]
[N/mm²]
[-]
[-]
[N/mm²]
[-]
[-]
[N/mm²]
[-]
[-]
Ø 34 mm
Ø 36 mm
Ø 40 mm
C12/15
1.6
0.7
1
1.6
0.7
1
1.5
0.68
1
1.5
0.71
1
C16/20
2
0.87
1
2
0.87
1
1.9
0.86
1
1.8
0.86
1
C20/25
2.3
1
1
2.3
1
1
2.2
1
1
2.1
1
1
C25/30
2.7
1.17
1
2.6
1.13
1
2.6
1.18
1
2.5
1.19
1
C30/37
3
1.3
1
2.9
1.26
1
2.9
1.32
1
2.8
1.33
1
C35/45
3.4
1.48
1
3.3
1.43
1
3.3
1.5
1
llows:
NRd,con = min (NRd,s; NRd * fbd,con- Factor * kb- Factor) [kN]
The conversion factor fbd,con , with the corresponding reduction factor kb, can be taken from the following table
depending on the drilling method, the concrete class and the diameter of the rebar:
Hammer drilling (HD), compressed air drilling (CD), hollow drill bit system (HDB)
Rebar
Ø
Ø8 to Ø32 mm
Concrete
class
fbd
fbd.con
- Factor
kb
- Factor
fbd
fbd.con
- Factor
kb
- Factor
fbd
fbd.con
- Factor
kb
- Factor
fbd
fbd.con
- Factor
kb
- Factor
[-]
[N/mm²]
[-]
[-]
[N/mm²]
[-]
[-]
[N/mm²]
[-]
[-]
[N/mm²]
[-]
[-]
Ø 34 mm
Ø 36 mm
Ø 40 mm
C12/15
1.6
0.7
1
1.6
0.7
1
1.5
0.68
1
1.5
0.71
1
C16/20
2
0.87
1
2
0.87
1
1.9
0.86
1
1.8
0.86
1
C20/25
2.3
1
1
2.3
1
1
2.2
1
1
2.1
1
1
C25/30
2.7
1.17
1
2.6
1.13
1
2.6
1.18
1
2.5
1.19
1
C30/37
3
1.3
1
2.9
1.26
1
2.9
1.32
1
2.8
1.33
1
C35/45
3.4
1.48
1
3.3
1.43
1
3.3
1.5
1